Shawn Li's RV-7 Building Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


10-27-2011:


 

Drilled the bolt holes on the mail ribs for the aileron bracket bolts


Drilled the counterbalance weight pipe through the nose rib tab. I managed to drill it using 6" drill bit. While instruction suggested to use 12" long drill bit


     [Previous]    [Next]


Make a free website with Yola