11-08-2012: 2.5 hrs

Started working on the baggage bulkhead. First I trimmed the F652 top bulkhead per plan, then drilled pilot holes on the top bulkhead. Even I was very careful about measuring the dimensions, I still made a mistake on the top two holes at the center. These two holes are not symmetric, when I measured and marked the locations for the these two holes, I forgot that I was marking on the back side of the bulkhead, so these two holes are shifted one inch to the right. No big deal, I redrilled the corret holes. It should be ok to leave these two hole open because the load the bulkhead won't be hight. But I will fill them using JB weld. After paint, no one will know.


Upper cargo wall is trimmed


Cargo side wall riveted with flush head on fwd side


Upper cargo bulkhead is notched for should harness cable


Close up view of the notch


Lower cargo wall is fitted to F706 bulkhead