Shawn Li's RV-7 Construction Log
Home
Construction Log by Dates
Construction Deviation and Analysis
RV-7 In Action
Analysis
Phase I Log
On Going Maintenance
Maintenace Info
11-10-2012: 2.5 hrs
Fitted the baggage bulkhead to F706, and drilled the holes to F706. Started installing nutplates, many of them.
F706 bulkhead is drilled with cargo walls, nutplates are ready to be riveted
<<Previous
|
Home
|
Next>>
Make a
free website
with
Yola