Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


11-10-2012: 2.5 hrs

Fitted the baggage bulkhead to F706, and drilled the holes to F706. Started installing nutplates, many of them.



F706 bulkhead is drilled with cargo walls, nutplates are ready to be riveted

<<Previous |  Home | Next>>


Make a free website with Yola