Shawn Li's RV-7 Building Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


11-13-2011:


Fuel tank attaching bracket fabricated


Another view of the bracket


Don't have the big fly-cutter, I drilled out the end rib the old fashion way


Many small holes are drilled along the edge of the cut out


The final result, pretty good

  

<<Previous |  Home | Next>>

Make a free website with Yola