Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-13-2013: 1.5 hrs


The pro-seal on the upper cowl hinge is still not fully cured yet after almost 3 days due to the low temperature, but I think it is cured enough for me to rivet the hinges to cowl. T

After finishing riveting upper cowl, I went working on the spinner


Top spark plug is removed for easy turning of the prop blade. I have to rotate the blade for final position of the spinner


Checking the waviness of the spinner backplate


A center point on the spinner nose is marked, and a pin is used as a reference point to positioning the spinner



<<Previous |  Home| Next>>

Make a free website with Yola