Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


01-24-2014: 2 hrs




Starter cable route around aft end of engine


Oil cooler installation is changed. Van's plan doesn't use washer on the ends of the tubes, but I feel it won't be durable because of the big slotted holes on oil cooler. I shortened the tube and added washers


Close-up view showing the washer




I installed the mag grounding incorrectly, it should be grounded at the ground stud on the mag, instead of airframe. I corrected that as shown here



<<Previous |  Home| Next>>

Make a free website with Yola