Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-07-2013: 3 hrs




Lower cowl is trimmed and fitted to fuselage


The cut out on lower cowl around left gear leg. This is the result of multiple iterations



Lower cowl cut out around right gear leg


It looks pretty good after initial trim


Top cowl is drilled to hinges


<<Previous |  Home| Next>>

Make a free website with Yola