Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-08-2013: 4 hrs


I

Lower cowl is drilled to bottom hinges


Another shot of the drilled lower cowl


Lower cowl is drilled to side hinges that connect to upper cowl


Detail of the front portion of side hinge. The hinge is slopped upward in aft direction for easy pin installation.


As you can see, the aft portion of the hinge is raised slightly


Right side hinge


Lower cowl is drilled to fuselage side hinge


Upper cowl oil door is cut


Upper and lower cowls are fit together for the first time


The seam between upper and lower cowl looks good to me


Right side seam


The gap between cowl and spinner is ok


<<Previous |  Home| Next>>

Make a free website with Yola