Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-09-2013: 2 hrs

Just prepared the upper cowl and hinges for bonding and riveting. Spent quite bit time to sand the hinge for better fatigue performance.


Additional holes are drilled for better bonding between hinge and cowl. Not sure if this really help. I will have some other hinge bonded without additional hole and see which one lasts longer


Close up view


The other side is prepared for bonding and riveting



<<Previous |  Home| Next>>

Make a free website with Yola