Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-19-2013: 2 hrs



Oil cooler location is determined, and doubler is made


I had to trim the oil cooler brace to clear the rivet head


Ignition wire seal is positioned on the left side


Oil cooler brace and baffle parts are clecoed together


Everything around oil cooler is clecoed together


<<Previous |  Home| Next>>

Make a free website with Yola