Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-20-2013: 2.5 hrs



The aft center bracket doesn't fit the rear baffle well, pushing baffle aftward


Another picture showing the aft center baffle support bracket is not fitting well


This area has to be trimmed a little to clear the engine case

 
Baffle is trimmed, and it now fits engine ok


Air ramps are clecoed to the side baffles


More trimming is required here to clear the engine case


It now looks better


Left air ramp is marked for trimming. Since the air filter box will be installed here, the construction will deviate from the instruction provided with the baffle kit


<<Previous |  Home| Next>>

Make a free website with Yola