12-12-2012: Ordered slider finishing kit
02-08-2013: Finishing kit arrived, start inventory - 1.5 hr
Canopy
04-17-2013: C668 spacers fabricated, Roll bar attached - 2 hrs
04-20-2013: Caopy frame, side track - 3 hrs
04-21-2013: Fitting canopy frame, rear track - 4 hrs
04-23-2013: Canopy frame, frustrating - 2 hrs
04-24-2013: More canopy frame work, not going anywhere - 1.5 hrs
04-25-2013: Canopy frame work, almost fit, need some minor tweaking - 1.5 hrs
(04-25-2013 to 06-10-2013:) worked on fuselage
06-12-2013: Continue canopy frame work, finally got the frame to match close enough - 1.5 hrs
06-13-2013: Fine tune frame, cut fwd bow 1/8", drilled rear track, fitted rear track brace - 1.5 hrs
06-15-2013: Another big mistake, cracked the canopy - 4.5 hrs
06-16-2013: Calmed down, continued working on the sliding canopy - 8 hrs
06-17-2013: Smoothed the front and rear edges of sliding canopy - 1.5 hrs
06-18-2013: Countersunk and enlarged rivet holes on canopy - 2 hrs
06-19-2013: Drilled holes on frame to #30, and deburred the holes - 2 hrs
06-20-2013: Fitted canopy to frame - 1 hr
06-21-2013: Readjusted canopy frame - 1.5 hr
06-22-2013: Canopy external handle and canopy track - 2 hrs
06-23-2013: Canopy side and rear tracks - 4 hrs
06-27-2013: Installed canopy rear anchor blocks - 2 hrs
06-28-2013: Canopy side skirts - 3 hrs
06-29-2013: Canopy side skirt braces - 1 hr
06-30-2013: Left canopy side skirt brace drilled to frame - 1.5 hrs
07-10-2013: Right canopy side skirt brace drilled to frame - 2 hrs
07-11-2013: Drilled side skirt brace to skirt - 1 hr
07-14-2013: Dimpled, painted side skirt parts, and reinstalled them back on - 3 hrs
07-15-2013: Canopy rear skirts - 5 hrs
07-16-2013: Canopy rear skirts - 2 hrs
07-17-2013: Canopy finishing up - 2.5 hrs
07-18-2013: Sliding canopy done - 3 hrs
07-21-2013: Canopy latch handle - 1.5 hrs
Engine Mount, Landing Gears
07-03-2013: Fitted engine mount and drilled firewall - 1.5 hrs
08-05-2013: Firewall recess, fuse trimming for landing gear leg, Installed engine mount - 2.5 hrs
08-07-2013: Left landing gear leg - 2.5 hrs
08-08-2013: Right landing gear leg - 2 hrs
08-10-2013: Wheels and brakes, airplane got legs - 6 hrs
08-28-2013: Panel wiring - 2 hrs
08-29-2013: Panel wiring - 8 hrs
Windshield
09-05-2013: Trimmed windshield - 2 hrs
09-06-2013: Fit and drilled windshield to rollbar - 2 hrs
09-07-2013: Aluminum windshield fairing work - 8 hrs
09-08-2013: Aluminum windshield rollbar strip - 4 hrs
09-09-2013: Aluminum windshield rollbar strip - 1.5 hrs
09-14-2013: Aluminum windshield rollbar fairing - 4 hrs
09-16-2013: Aluminum windshield rollbar fairing - 2 hrs
09-24-2013: Windshield is drilled to #30 and countersunk for #6 screw - 1.5 hrs